Morello Case Study

Porter Building Case Study

The Porter Building presented a range of demanding challenges for the Aquarian team but now complete, this flagship project has transformed a key development area in central Slough.

Thanks to Gebrik’s impressive versatility, both the project architect’s exacting requirements and the build programme’s tight timeframe were met, with over 4,000m2 of Gebrik installed by specialist cladding company CCS Facades in 7 months. Dave How, Quantity Surveyor at CCS Facades, confirms: “The main drivers for using Gebrik were the large choice of bricks, components and bond patterns to choose from, quicker install times than traditional brickwork, and mostly non-weather dependent installation. Gebrik was the natural choice for this project.”

The facade’s stepped design included many features, including 3 different bond patterns...

Download the full case study here

Download the full case study here

Main Contractor

Bowmer Kirkland

Installer

CCS Facades

Architect

TP Bennett

Client

Landid

Contact Info

Eversea Business Centre, 13 Gardens Road,
Clevedon, Somerset, BS21 7QQ
United Kingdom
T. 0808 223 9080
F. 0844 755 0289
E. info@aquariancladding.co.uk
© 2018 Aquarian Cladding Systems

Members

CWCT_White_opt.png
CESW_White.png